9700 DWT Bulk Carrier
Client: Zong Heng
Vessel: Bulk Carrier
Status: Completed (2021-2022)
Scope: PM, engineering review & supervision

Client: Zong Heng
Vessel: Bulk Carrier
Status: Completed (2021-2022)
Scope: PM, engineering review & supervision

Client: Grimaldi/RINA
Vessel: New Build RoPax
Status: Completed (2022-2023)
Scope: Construction supervision

Client: Grimaldi/RINA
Vessel: New Build RoPax
Status: Completed (2022-2023)
Scope: Construction supervision

Client: Zong Heng
Vessel: Bulk Carrier
Status: Completed (2022-2024)
Scope: PM, engineering review & supervision

Client: Yinson
Vessel: FPSO
Status: Completed (2023-2024)
Scope: COW support, mech completion & pre-comm

Client: MODEC
Vessel: FPSO
Status: Completed (2022-2023)
Scope: Full mechanical completion & commissioning

Client: MODEC
Vessel: FPSO
Status: Completed (2021-2022)
Scope: Turret works, tubing & cable installation

Client: BWE/Novetus
Vessel: FPSO
Status: Completed (2025)
Scope: Manpower & site office services for FPSO

Client: SBM Offshore
Vessel: FPSO
Status: Completed (2021-2022)
Scope: Structure fab & CompEx inspection

Piping & Outfitting Fabrication Shop in Nantong, China Piping Fabrication Shops: Total 10,000m2 with annual production capacity of 800,000 dia-inch Outfitting Fabrication Shop: Total 6,000m2 with annual production capacity of 3,000 tons Inconel pipe and fitting fabrication shop: total about 2400m2 and capacity of 60T welding consumables. Hydraulic Torquing Pump sets Flange management control system

Client: Yinson
Vessel: FPSO
Status: Completed (2021-2022)
Scope: Module works, cable term & LSA inspection

Client: MODEC
Vessel: FPSO
Status: Completed (2020-2021)
Scope: Multi-discipline team for module works

Client: BWE/Novetus
Vessel: FPSO
Status: Completed (2025)
Scope: Manpower & site office services for FPSO

Client: Yinson
Vessel: FPSO
Status: Completed (2024)
Scope: Cable termination & module carry over works

Client: SBM Offshore
Vessel: FPSO
Status: Completed (2025)
Scope: PM & commissioning support for SBM FPSO

Completion date: WIPYard Location: HRDDCounty: Chinn Marine – Cable TerminationModule Carry Over Works Electrical ITR Closing Electrical Punch Closing Piping ITR Closing Piping Punch Closing

This is the MV31 FPSO which we participated in Dalian Changxin Island for MODEC

LAnti-Explosion Cable Gland Installationarge-Scale Valve InstallationGRE Pipe Fabrication and InstallationLarge-Scale Valve InstallationEquipment (Plate Cooler) Installation and orientation Hull Structure ConstructionHull Structure ConstructionOil Flushing Manifold OnboardPressure Safety Valve (PSV) InstallationPW Module construction and InstallationSea Water Treatment Filter InstallationPW Module construction and InstallationAnti-Explosion Cable Gland InstallationTechnical Flange Management Team

Topside Modules Fabrication Work carried out by OES